The roof was finished on Monday. The only thing that needs to be done is put the copper on the porch. The plumbing, electric and HVAC are near completion and should be finished up by this weekend. Brick and stone should be arriving any day and the back porch under the hearth room is going to be poured at some point this week. It was suppose to happen yesterday but the rain scared the concrete guys away.
Pepe and his crew found their way back today to finish up some odds and ends. The most noticeable is the framing of the fireplace and the master bath. Berkley is trying to figure out which tub is hers. I don't think she can figure out the master bathWe are now framing the bulkhead in the basement along with setting up the home audio and intercom systems. This is much easier for the constructionally challenged. We hope to finish that up Sunday but we are waiting on the cables to arrive in the mail.

1 comment:

Mom and Dad said...

The house is really taking shape! I know that you are anxious to move in and we hope it won't be that much longer. It looks like the "Inspector" is doing a great job checking everything out. I bet she dreams of the huge yard that she can play in.